Pakistan Telecommunication Authority (PTA) has proposed a phased shift of telecom towers to alternative energy sources, including solar power, battery storage and hybrid systems. The aim is to reduce diesel consumption, deal with frequent power outages and improve the reliability of mobile networks. The regulator has invited telecom operators and infrastructure providers to submit time-bound plans for converting Base Transceiver Stations (BTS) to alternative energy. The proposal comes at a time when power cuts continue to affect mobile service in many areas, and towers that depend on diesel generators for backup face high running costs along with supply difficulties.
Under the proposed roadmap, operators have been asked to identify sites that experience prolonged outages, assess whether renewable energy solutions are feasible there and propose investment plans with implementation timelines of one, two or three years. PTA has also sought industry feedback on whether solar installations should be made mandatory at sites that face monthly outages of 5 percent or more. The authority has set a deadline of December 7, 2026, for comments. A mandatory requirement of this kind would directly affect the investment decisions of operators and tower companies, which is why the regulator wants the views of the industry before it takes a position.
The roadmap also calls for a cut in diesel use at the 10 percent of BTS sites that consume the most diesel. Operators would need to provide details of their existing energy use, backup arrangements, grid availability and the reductions they propose. PTA has stressed that any alternative energy system must ensure uninterrupted connectivity during the night, in cloudy weather and in other periods when solar generation is limited. This condition shows that the regulator does not want a lower fuel bill to come at the cost of service quality, so batteries and hybrid arrangements are part of the plan alongside solar panels.
The authority is also considering incentives for energy-efficient operators, shared renewable energy infrastructure and coordination with power sector institutions. It has invited telecom companies, tower operators, energy providers and other stakeholders to send their recommendations before the deadline. Shared infrastructure could be useful where several operators use the same tower, since the cost of solar equipment can be divided among them. Once PTA receives the feedback, it is expected to decide how to proceed with the proposal and whether targets or mandatory requirements will be set for the sites with the most outages.
Follow the SPIN IDG WhatsApp Channel for updates across the Smart Pakistan Insights Network covering all of Pakistan’s technology ecosystem.